India's short-term power market: power exchanges, HP-DAM and price caps

By CAShorts DeskPublished Source: The Indian Express (19 Nov 2026); Central Electricity Regulatory Commission regulations and orders; Ministry of Power guidelines (PIB).

Why in news: At least five States and private discoms floated DEEP-portal tenders for January-July 2027, some at Rs 19-20 a unit, a 19 November 2026 report said.

India's short-term power market: power exchanges, HP-DAM and price caps
Illustration (AI-generated)

India's power exchanges are electronic markets where electricity is bought and sold in auctions. The Central Electricity Regulatory Commission (CERC) registers them and sets their rules. Bids are capped at Rs 10 a unit, or Rs 20 in the High Price Day-Ahead Market. At least five States and private discoms tendered for 2027 power, some at Rs 19-20 a unit.

Syllabus: GS3 · Indian Economy & Growth; GS2 · Statutory & Regulatory Bodies; GS3 · Infrastructure

Why this matters for UPSC

GS3 economy: energy infrastructure and the power exchanges CERC regulates. Prelims can ask the market segments and the HP-DAM ceiling; Mains, how discoms buy short-term power.

In short

India's distribution companies buy short-term power on power exchanges, which CERC registers and regulates under the Power Market Regulations, 2021, or through tenders on portals such as DEEP.

Contracts and segmentson a power exchangeDay-aheadcontractsReal-timecontractsTerm-aheadcontractsIntraday andcontingencycontractsHigh PriceDay-Ahead Market

Price ceilings and the HP-DAM should be reviewed with resource adequacy planning, so that protecting buyers does not drive scarce power into costlier tenders.

Why it matters

A family's electricity bill depends partly on what its distribution company pays when it needs power at short notice. On an exchange, the ceiling protects that company, and the households behind it, from runaway prices on a tight evening. But a ceiling can also stop the costliest plants from selling at all, which is why a separate high-price window was opened. When buyers fear a squeeze and turn to tenders outside the exchange, the cap no longer limits what they pay, and the extra cost can travel into tariffs. The design question is how to keep prices fair without leaving power unsold when it is most needed.

Prelims pointers

  • Day-ahead and real-time markets use a double-sided closed bid auction; for an unconstrained market, one uniform clearing price applies to every cleared buyer and seller.
  • CERC, not the Central Electricity Authority (CEA), registers power exchanges; the CEA is the Ministry of Power's planning body.
  • Besides delivery contracts, power exchanges trade Renewable Energy Certificates and Energy Saving Certificates; capacity and ancillary services contracts need the Commission's approval.
  • HP-DAM sellers: gas plants on imported RLNG or naphtha, plants burning imported coal alone, and battery storage; CERC refused plants that blend imported coal.
  • Term-ahead contracts are settled by physical delivery of electricity and bind the parties that execute them; circular trading is barred.
  • The 2021 Regulations let a Market Coupling Operator take over day-ahead and real-time price discovery as and when CERC notifies it.
  • Day-ahead and real-time trades are scheduled in coordination with the National Load Despatch Centre, following the Grid Code and open access rules.

Practise a UPSC-style question

With reference to power exchanges in India, consider the following statements:

1. Under the Power Market Regulations, 2021, the Central Electricity Regulatory Commission grants registration to a power exchange.

2. A power exchange's registration is valid for ten years from the date of grant unless revoked earlier.

3. In an unconstrained day-ahead market, every cleared buyer and seller gets the same uniform market clearing price.

Which of the statements given above is/are correct?

  1. (a) 1 and 2 only
  2. (b) 2 and 3 only
  3. (c) 1 and 3 only
  4. (d) 1, 2 and 3
Show the answer

Answer: (c) 1 and 3 only

Answer: (c) 1 and 3 only. Registration runs for twenty-five years, not ten.

Statement 1: correct. CERC grants and renews a power exchange's registration under its Power Market Regulations, 2021, after the inquiries it needs.

Statement 2: incorrect. The 2021 Regulations make a registration valid for 25 years from the date of grant, unless it is revoked or cancelled earlier.

Statement 3: correct. Day-ahead and real-time markets use a double-sided closed bid auction; the unconstrained market clears at one uniform price for all cleared buyers and sellers.

Eliminate: Be sure of statement 2 first: the term is 25 years, so it is incorrect. Out: (a), (b), (d).

Trap: Near-miss figure. The validity period is cut from twenty-five years to ten, a change easy to miss in a statement that otherwise reads like the rule.

Remember: CERC registers a power exchange for 25 years; prices clear at one uniform price.